1. Pakage No. AP06PIIIDUGLB 02 Construction of high level bridge at km 1/7 Km on TM road to Uppalaguntavia Manchikalapudi KR Konduru Punumuli in Duggirala Mandal of Guntur District.Estimate Cost Rs.230.00 Lakhs |
NITNo.24/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
2. Package No. AP06PIIIRAJLB01 Const of Bridge on the road providing BT road from Reddygudem to Brugubanda via Mokkapadu in Rajupalem Mandal of Guntur District with Estimate cost Rs.566.00 lakhs |
NITNo.28/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
3. Package No.AP06PIIIKAKLB01 - Const of Bridge on the road from Pedapalem to Bapatla-PN Padu RandB road and 15.60 Km in Kakumanu Mandal of Guntur District Estimate Cost Rs.298.00 Lakhs Maintenance Rs.8.20 lakhs (5th call) |
Nit No.25/2024-25 Dt.21.09.2024 of the Superintending Engineer, PR circle, Guntur (5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
4. Package No.AP06PIII BPTLB01/Const of HLB across Nallamada drain on the road from NH-216 at Kamma Kalyanamandapam to Perali in Bapatla mandal of Bapatla District Erst while Guntur District Est Cost Rs.1410.00 lakhs. |
NITNo.22/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
5. Package No. AP06PIIIDACLB01- Const. of High Level Bridge on Road fromSP Agraharam to Chennayapalem via Tangeda at 2/4 Km of Dachepalli Mandal, Estimate Cost Rs.275.00 lakhs |
NITNo.23/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
6. Package No.AP06PIII NIZLB02/Const of HLB across Repalle main drain on the road from RN RnB road at Km 16.0 to Konapalem in Nizampatnam Mandal of Bapatla District Erst while Guntur District Est Cost Rs.640.00 lakhs |
NITNo.26/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
7. Package No.AP06PIII PVPLB01/Construction of HLB across Tungabhadra drain on the Road from Pittalavanipalem to Ganapavaram in Pittalavanipalem Mandal of Bapatla District Erst while Guntur District Est Cost Rs.913.00 lakhs |
NITNo.27/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
8. Package No.AP06PIIINIZ01 T14 Nizampatnam RN RandB road at Km 25.0 to CBN RandB road at Km 4.0 via Darveshpalem,Gattuvaripalem and Pedapalli in Nizampatnam Mandal in Bapatla District Erstwhile Guntur District Est Cost Rs.568.00 lakhs. |
NITNo.29/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(6th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |
9. Package No. AP06PIIIPEDAK 01 T20-NH5 417Plus0.67 Km to Jonnalagadda in Guntur Rural Mandal via Koppuravuru in Pedakakani Mandal of Guntur District. Est.Rs.471.00 Lakhs |
NITNo.30/24-25 Dt.21.09.24 of the Superintending Engineer, PR, Circle, Guntur(5th Call) |
24-Oct-2024 05:00 PM |
24-Oct-2024 05:30 PM |